Construction Photos

April 2009  

Two loads of ties were picked up from Kitchener Frame who donated them last summer. Thank you to Lori at Prestige Acoustics for supplying the truck and driver.

 

The first lift of ballast was placed under the north end of Track 22 and the rail was leveled ready to store #9 and #1518 prior to the foundation starting. Finish ballasting was completed after the building was finished.

 