![]() |
![]() |
|||
|
Construction Photos
August 2008
On the 10th we were at Kitchener Frame to remove a load of rail and dig out a switch to reuse. Kitchener Frame donated all the rail and OTM. |
||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Our building permit was received on August 20th. |
||
|
|||
|
|||
|