Return To Previous Page

Home


Construction Photos 

May 2008

The existing siding N20 ran through the area where the shop will be located. Removal of the north two thirds of the siding was required prior to the construction commencing. The remaining portion of the siding will be temporarily realigned and connected to shop track N22 until the south end of the yard can be completed.

 


Send mail to the Webmaster with questions or comments about this web site.

Return To Previous Page Home

Last Edited November 22, 2019

Copyright © 2007-2020 SOLRSWAT  All Rights Reserved.