Southern Ontario Locomotive Restoration Society | ||
operating as the "Waterloo Central Railway" | ||
|
SOLRS (WCRX)
ETR 9 - Alco (MLW) 0-6-0 Switcher
2012 Rebuild
May 12th 2012, No. 9 Was fired up for her first main line test run to Elmira, Ontario and back under full power.
May 11th 2012, No. 9 is test fired to half her working pressure. One more critical step to get her operational.
May 9th 2012, Connecting #9's tender for the final reassembly before lighting her up.
Final assembly if the drive rods etc. preparing her to move.
A series of pictures of the work over the last many months certifying the boiler and re-working the bearings and wheels.
|
|||
|
|||
|